Solution-Building Envelop

2023-05-25


第10页-55.PNG第10页-54.PNG

Design phase

Follow up the design stage drawing audit

Preparation of peripheral protection structure

Field inspection list



Construction phase

Audit of test results of outer envelop

Preparation of construction phase report


Operation phase

On-site inspection during operation phase

Prepare site check list for final adjustment report